The consultancy services provider, based in the United States, wanted Twisted, a technical team of experts, to implement a data centre in the UK, within a fixed completion time of 8 weeks to increase their connectivity on a global scale.
The Solution
A high capacity, fibre and copper data infrastructure was implemented in a 325m2 data hall with 72 cabinets and a two-tier ladder cable management system. The modular solution is scalable and includes pre-terminated cabling to allow for reconfiguration and growth in the ever-changing workspace. Overall, the project spend was £1.4m.
At Twisted we create relationships with the client from the ground up and work together in partnership, to guarantee a high quality service level.
Josh Carson, Twisted Project Manager says:
We had to negotiate a very strict critical path with the importation of materials from the US being the main obstacle. However, even during the Brexit formalities which happened during the project, Twisted completed the fit-out to the expectation of the client in the given timeframe and to industry standard.
Leave a comment
You must be logged in to post a comment.