In the midst of the Covid pandemic, the multinational company required the delivery of a multi-discipline, multi-floor office fit out in Paris.
The Solution
Across 14 floors, Twisted installed Audio Visual solutions as well as Data and Access Control Cabling. Weekly visits from a single project manager took place over the six month delivery period to ensure that excellence was achieved.
The solution for this client was a fibre optic and copper data infrastructure that included 9 comms rooms and 15 data cabinets. To create a secure facility, an Excel cabling solution was created for 180 access control door positions and 129 CCTV cameras. The AV solutions included the completion of 71 meeting rooms as well as 2 large event areas for multi-purpose use from the circa 2,200 occupants.
Twisted’s agility and existing relationship with the client was the ultimate factor that led to a successful practical completion within the given timescales and Covid-19 restrictions.
Josh Carson, Twisted Project Manager says:
During the delivery of this project, we were evermore faced with COVID-19 restrictions and then ultimately Brexit red tape. Nonetheless the Twisted team pulled together, successfully handing over before the practical completion date originally set out in the early stages of mobilisation.